Monday, 14 March 2011

R101 from the Outside

The pictures in this section are devoted to the “new” Ops Block, the R101, and show the exterior of the building from start to after closure. I am already gathering pictures of the interiors of both the R101 and the R10 for sections I hope to produce in the future. However, it is proving harder to find photos taken inside the buildings than it has been to find photos of the outsides. I would therefore welcome any pictures of the inside of either the R10 or R101, which I would be able to use. My email: gordon.carle@gmail.com

In the period 1976 to 1979 many of the buildings on Saxa Vord were demolished, replaced or refurbished. At the same time the main radars were replaced and most of the electrical equipment was greatly modernised. Those working “up the hill” were on a major construction site. NATO agreed to underwrite the Unit upgrade at a cost of £10 million (it went a lot further then). Most of the work was completed by summer 1979, at which time to Ops staff started the move from the R10 to the R101.
The first photo shows the Ops Site before the main work started, the only visible evidence of the upheaval to come are a few stakes in the foreground. (Left click on photos to enlarge).

The next sequence of photos shows the start of serious construction work on the R101. A Large amount of heavy plant had to be imported to Unst and the problems with getting to the top of Saxa were significant – it’s no wonder that the road from the domestic to the top site had to be rebuilt shortly after – but that’s another story.
It had been decided to retain the R10 for the extra space it provided and a covered way or tunnel was built between the R10 and R101. The Police Piquet Post remained the entry and exit point for operations staff. The next 5 pictures show the construction of that covered way and how it looked after completion.

The next four photos are all taken at the south end of the R101 at a slightly later time in its assemby.
A new access road had to build to the new ops block.
The next 2 images are closer shots of the external blast doors before and after completion. The emergency exit from the building was located on the side of the building to the right of the external blast doors.
The following shots show the R101/Ops site fully operational in the period 1983 and 84:
In 1984 the Ops staff moved back out of the R101 back to the R10 into an interim facility (see earlier section in the blog : http://ahistoryofrafsaxavord.blogspot.com/2010/10/interim-ops-room-1984.html ). This was a pre planned move with GL161 equipment shipped up and installed for the occasion. I have still to ascertain exactly what happened inside the R101, but it would certainly have involved the installation of more up to date equipment and I do intend writing about this later. Whatever happened inside, work certainly occurred on the outside of the building as well, as the next 2 pictures show.

The last 3 views are just general scenes of the Ops Site, taken in 2010. Two rectangular structures can be seen on the roof of the R101 – they were constructed in 1984. I have no data on what they are (water tanks, outside loos, artificial bonxie nests – until someone lets me know I’ll keep on guessing)
CONTENTS LIST

Tuesday, 8 March 2011

Views of Shetland, Unst and Saxa from Above

Various photos of the Top Site, Domestic Site and TACAN Site on Vallafield from above have appeared earlier on this site. The pictures in this section are fairly self explanatory. Whilst I have tidied up most of the photos there are a couple where I haven’t tried to level the horizon – one taken north of the Top Site in particular where some detail would be lost. The pictures start at the south end of Shetland and work northwards before returning to the Domestic Site.  (Left click on pictures to enlarge).
The next 5 photos are possibly taken from Bristows Helicopters, especially those to the north of Unst.
I’m grateful to Frank Josephs and to John Courtis for their permission to use the next two photos of the Domestic Site it its' earlier phase, one from each end of the camp.

The last 2 pictures of the Domestic site are MOD plans, one from the earlier days and the second from after the rebuild is nearly complete .
I don’t have a decode for the second plan but my memory would correlate some of the numbers as follows:

1 - Airmens Accom
2 – Viking Club
3 –Airmens Mess
4 – Central Kitchen
5 – ?
6 – Sgts Mess
7 – Off Mess
8 – Ice Cap
I am quite happy to be corrected if I’ve got the numbers above wrong & to be told what number 5 was!

Footnote There are many clips of Shetland available on youtube - I have put links to 2 videos of landings at Sumburgh and one on the Unst Airstrip below:

www.youtube.com/watch?v=lz5_7gXkqgs&feature=related

www.youtube.com/watch?v=24j30BnDMzQ&feature=related

www.youtube.com/watch?v=00-rF0UtfUM

CONTENTS LIST

Thursday, 3 March 2011

The Type 80 is Off - Part 2

In March 2010 I published a section entitled “The Type 80 is off (Literally) – 27 Jan 1961”:-
http://ahistoryofrafsaxavord.blogspot.com/2010/03/type-80-is-off-literally-27-january.html
One of the servicemen who was at Saxa at the time, John Courtis, took some photos at the top site soon after the T80 aerial was blown off its’ turntable. At the time John was a Fg Off and was OC Accounts. Although some photos were published in the earlier section there seem to be few pictures of the event and therefore I am glad to be issue some more. I am grateful to John for allowing me to copy his photos and use them on this site.
The T80 reflector assembly weighed about 18 tons and measured 75x25 feet (22.86 x7.62 metres for the young ones). There is little else to say other than the elements are hard to withstand, especially at a place like Saxa Vord.- the pictures speak for themselves. (Left click on photos to enlarge).





The weather must have improved slightly by the time the  2 photos above were taken as people can be seen working on the T80 gantry. An enlargement is attached below|:
 
I know that this was the second T80 Reflector to come to grief - the first was destroyed late in 1956 or early 1957, some time before the Unit opened, I have been trying to get hold of photos of this earlier event for a long time, unfortunately without success. Should anyone have, or know the location of, any photos showing this event I would be pleased to hear from them. I know photos exist. gordon.carleATgmail.com (replace the AT)